Sign In | Join Free | My chinalane.org |
|
Brand Name : HUASHIDA
Model Number : 110-2200
Certification : CE, ISO9001:2008
Place of Origin : Qingdao China
MOQ : 1
Price : US$200,000.00-1,000,000.00
Payment Terms : L/C,T/T,Western Union,MoneyGram
Supply Ability : 30 Units/Year
Delivery Time : 60 Days
Packaging Details : Standard Pakage
Customized : Customized
Application : Producing Pre-Insulated Pipe Jacket
HS Code : 8477209000
The HDPE pre-insulated pipe production line mainly produces three-layer composite pipes:
Inner steel pipe: Used for transporting water, natural gas, oil, etc.
PU insulation layer: Minimize heat loss to the greatest extent.
HDPE outer sheath: Provides corrosion resistance, UV stability and mechanical protection.
This pipeline adopts vacuum calibration technology to ensure a smooth surface, uniform wall thickness and excellent rigidity. It is an ideal choice for underground pipelines in district heating, oil and gas transportation and geothermal systems.
Style | PE-110/500 | PE-655/1380 | PE-960/1860 | PE-1155/2200 |
Main Extruder | SJ-75/33 | SJ-120/33 | SJ-150/33 | SJ-150/33 |
Pipe diameter | Φ110-600mm | Φ655-1380mm | Φ960-1860mm | Φ1155-2200mm |
Capacity | 250-350kg/h | 700-900kg/h | 1000-1200kg/h | 1350kg/h |
Installed power | 160kw | 480kw | 580kw | 650kw |
Length | 26m | 36m | 45m | 45m |
Production Line Composition Table
No | Name | Qua. |
1 | Automatic vacuum feeder | 1unit |
2 | High efficiency hopper dryer | 1unit |
3 | High efficiency single screw extruder | 1unit |
4 | Mold 110-2200mm | 1set |
5 | Vacuum calibration box | 1unit |
6 | Cooling calibration box | 1unit |
6 | Hauling machine | 1unit |
7 | Planetary cutter | 1unit |
8 | PLC Computer control system | 1set |
9 | Pipe bracket | 1set |
High-Speed & High-Efficiency:
♥Provides large output with stable performance.
No Trimming Needed :
♥One-step forming ensures smooth, burr-free pipes, zero post-processing waste.
Uniform Wall Thickness:
♥Adjustable die-head bolts allow precise thickness control for different applications.
High Automation & Rduce Cost :
♥The high degree of automation reduces labor costs and improves production efficiency.
Energy Saver:
♥Barrier screw design cuts energy use by compared to conventional extruders.
![]() |
High Speed Production Pre-Insulated Jacket Pipe Extrusion Manufacturing Line Images |